An Official Web Site for New Hampshire Government
Safety
Consumer
Regulatory
Safety
Electric
Gas & Steam
Telecom
Water & Sewer
Sustainable Energy Sustainable
Energy
 
Enter Search Request
 
General Information
skip nav 
Contact Information
skip nav 
Report Forms
   
Dig Safe
Underground Damage Prevention Overview
Dig Safe Rules
Dig Safe Laws
Enforcement Program
Overall NH Damage Prevention Statistics
811 Dig Safe
"Call before you dig"
Underground Damage Report Forms
Utilities By City/Town
Education and Training
   
Pipeline Safety
Pipeline Safety Overview
NH Pipeline Mileage Statistics
Authorities per NH State Law/Administrative Rules
Pipeline Safety Program Funding
Accelerated Cast Iron Bare Steel Replacement Programs
Pipeline Safety Incidents in New Hampshire
Regional and National Involvement
Pipeline Safety Rules
Safety Forms
Education and Training
   
Electrical Safety and Reliability
Electrical Safety and Reliability Overview
Electric Franchise Map
   
Security
Security
   

Orders
Rules
Tariffs
Links
  - Links Disclaimer
 


125 psig methane pipeline for UNH

Pipeline Safety Program Funding

In December 2006, the U.S. Congress authorized an increase in the federal share of funding for pipeline safety programs, from the current maximum of 50/50 federal/state cost sharing to a maximum of 80/20 federal/state cost sharing.  2014 marked the first year New Hampshire attained reimbursements at the maximum permissible level without requiring suspension funding.  Federal projections indicate that as long as New Hampshire is able to maintain its quality program the Safety Division should continue to receive federal funds to cover approximately 80% of the program’s cost.  This assumes appropriate funding is provided by Congress in reauthorization legislations.  The Safety Division is allowed reimbursements for all direct expenditures related to pipeline safety as well as certain indirect costs.  The Safety Division’s grants are based on a federal fee assessed to interstate pipelines by the Pipeline and Hazardous Material Safety Administration that included in rates approved by Federal Energy Regulatory Commission and subsequently collected from the local distribution companies as an allowable cost within cost of gas dockets.  The remaining funding is through assessments provided to New Hampshire Public Utilities in accordance with RSA 363-A
           
In June 2014, the NH Legislature passed HB 1224  amending RSA 363:22 by adding a new section directing the Commission to petition the federal government to seek certification to perform interstate pipeline inspections for the lone hazardous liquid pipeline and the four interstate natural gas transmission pipelines in New Hampshire-see RSA 363:22-a.  In 2014 and 2015, the Commission submitted a request but was denied by PHMSA.  A third request will be made in 2016.